The new concession stand and bleachers at New Richmond High School in New Richmond, WI, were recently completed in time for the 2020 football season. Clark Engineering, now IMEG provided structural engineering and design services for the stadium, which includes gates, ticket booths, concession stands, bathrooms, bleachers to seat 2,300 spectators, and a press box. 

New Richmond High School students and staff worked with the design team and contractors to complete the project. The high school metal class students worked on the overhead gateways at the entry and railings, which feature logos from previous yearbooks, and the wood shop class worked on the wood framing for the concessions and east ticket buildings. 

Read more.