Seismic Evaluation & Upgrade
IMEG provided seismic SPC-4D, NPC-4D, and SPC-2 evaluation & upgrades for:
- Main Building
- Patient Tower
- ICU/Emergency & Lab Building
- East Wing
- Pediatrics Building
- Cafeteria Building
- Boiler Building
- Dining Building
The existing Buildings, constructed from 1920’s to 1970’s with various structural systems, mostly masonry and concrete. Our firm provided efficient seismic retrofit plans with consideration given to the hospital being fully operational with least interruption during construction work.
Our team is also coordinating the construction phase of each project to ensure minimal disruption to hospital services was achieved. This was done through close coordination between the Medical Center, general contractor, cost estimator, and design team.