IMEG provided engineering design and construction administration services for approximately 13.2 MWp(dc) of photovoltaic power production facilities at various Arizona State University campuses, including Tempe, Downtown Phoenix, West, and Polytechnic.

The project includes arrays at the following buildings: Bio Design; Weatherup; Carson Athletic Center; Hayden Library; Parking Structure 4; Parking Structure 7; and West Campus Parking Lots 1, 2, and 3. Numerous systems are employed in the designs, including single axis trackers, ground mounted fixed arrays, covered parking structures and roof mounted ballasted systems.

Engineers worked with the system owner and operators, giving careful consideration to the parameters of construction schedule, construction cost, reliability, efficiency, safety, and cost of ownership.