New Nine-Building Headquarters
IMEG’s San Francisco structural team provided engineering design and services for the Franklin Templeton Headquarters, a nine-building project that included trash enclosures, loading docks, landscape features and mechanical equipment space. The nine buildings include a one-story warehouse with loading docks; two three-story, 120,000-sf office buildings over a subterranean garage; two four-story, 120,000-sf office buildings over a subterranean garage; and a two-story, 60,000-sf office building.