IMEG captured drone footage of the removal of an existing bridge and the construction of a new box culvert in Day County, SD. Protecting the site from water and extreme cold temperatures was crucial to the project’s success. With a confined workspace that could be covered and protected, construction was completed over the winter season, minimizing impacts to the community.