IMEG provided structural engineering design services, along with parking consultation, for several buildings in the 1,073,600-sf SORA West development including a 524,838-sf, 13-story structural steel with slab-on-metal deck office building for AmerisourceBergen. The headquarters includes a fitness center, 16,000-sf rooftop terrace, and a 76,372-sf, 173-car, two-level basement parking garage.

In addition, the complex features a 88,000-sf, seven-story, 130-key Tapestry Hotel by Hilton, with five stories of wood frame over a two-story steel frame podium with concrete-on-metal deck. A two-story building links the hotel to an existing historic firehall (circa 1800) which serves as hotel lobby and restaurant space.

Also on site is a 460,762-sf, 12-level precast concrete parking structure for 1,479 cars and a central plaza.