Laboratory Renovation
IMEG prepared a complete building study and evaluation of existing MEP systems to determine suitability for reuse, and subsequently, completed final design of MEP/FP systems. The scope involved a complete building renovation with new central chilled water service from the campus distribution system and reuse of existing steam service. Project included a new sprinkler system, electrical service upgrades, 4-pipe HVAC system and chilled beam cooling and energy recovery air handling systems. All disciplines were designed with Revit MEP software. Paige Laboratory is certified LEED Silver.