IMEG provided P/FP design and CA with an early under-slab work package. Work included design of advanced grey water and water-reuse systems; a UV filtration system for stormwater re-use; a fire pump, domestic water booster pumps, and wet and dry sprinkler systems; two separate P/FP pressure zones; and all systems for the vivarium, including cage wash and watering. Coordinated all work around an existing underground utility tunnel.