IMEG provided land surveying, civil engineering, and site planning services from initial conceptual plans through final detailed civil/site construction plans and consultation for a 129,836-sf, three-story elementary school utilizing a new building prototype to accommodate a smaller, urban-sized parcel of land.

Included in the design for the new school site is a storm sewer system design, stormwater management and best management practices design, water and sewer utility design, and water system modeling to provide fire flows for building protection. Engineering consultation, design, and coordination with the owner and project architect was provided throughout the project.